HDB electrical loading is the amount of current your flat’s supply is designed to carry at once, set by the rating of its main switch. It decides how many heavy appliances can share your HDB electricity supply at once, whether you need a permit for an air-conditioner, and how to plan new power points during a renovation. This guide sets out what HDB publishes on each point, and how to plan the load on a power track.
HDB blocks completed on or after 1 January 1994 have a 40-amp main switch, and blocks under the Main Upgrading Programme also have their supply upgraded. About 1,500 older blocks still on 30 amps are being raised to 40 amps in phases. With the higher loading, flat owners can install an air-conditioner straight away, as HDB’s permit step applies to flats on the older supply.
Every flat draws its power through a main switch, and the switch’s rating in amps is the ceiling for everything running at the same moment. When the kettle, the oven and the air-conditioner all run together, their current adds up against that ceiling. Planning around it is what keeps a renovation within HDB’s rules and avoids tripping the supply.
HDB states that apartment blocks completed on or after 1 January 1994 are provided with a 40-amp main switch, and that the incoming supply is also upgraded for blocks under the Main Upgrading Programme. Older blocks outside those groups may still run on a 30-amp main switch. HDB’s electrical load checker tells you which applies to your block from its postal code.
For the older blocks, the Ministry of National Development said in November 2020 that under the Electrical Load Upgrading Programme, HDB will upgrade the supply to each unit from 30 amps to 40 amps for about 1,500 older blocks. The works run in phases across the older estates.
Where a flat is provided with the higher electrical loading, HDB lets flat owners install an air-conditioner or other higher-capacity appliance straight away. Flats on the older 30-amp supply go through HDB’s permit process before that work, so check your block first and plan the permit into your renovation timeline.
A power track shares one supply across every appliance plugged into it. Each of our UK adaptors is rated at 13A and takes one appliance, one metre of our track supports up to 11 adaptors, and the total power draw of everything plugged in should stay within 8,000 watts. Our guide on how a power track works explains the rail and the adaptors in more detail.
Before you plan a busy counter, add up the wattage printed on each appliance’s rating label, and give heavy appliances that run together their own track or wall socket. Our kitchen power track guide shows how that works on a kitchen counter.
For a TV or feature wall, our wall power track guide shows how the same load plan applies along a wall.
Any new wiring in a flat should be done by a qualified electrician. When you buy a track from us, our own electrician and contractor install it for you and connect it at the end terminal. Installation is generally S$60 per point, and our power track price guide shows how the track, the adaptors and the installation add up.
Our power track range shows every series and finish, and our page on power tracks in Singapore sets them side by side. Book a complimentary consultation at our design showroom near Kallang, and bring your flat’s completion year and photos of the wall or counter you have in mind, so we can plan the load with you.
Yes. The track draws from the same supply as your wall sockets, so in a 30-amp flat keep fewer heavy appliances running on it at once. Our consultants can help you decide which appliances sit on the track and which stay on their own socket.
The main switch cuts the supply when the combined current passes its rating. Spread heavy appliances such as the oven, kettle and air-conditioner across different times or circuits, and add up their wattage before plugging them in together.
HDB gives priority to blocks already selected for the Home Improvement Programme and Neighbourhood Renewal Programme, and groups nearby blocks together so fewer new electrical substations are needed to serve them.
A power track shares your flat’s existing supply rather than adding capacity, so your main switch rating stays the same. Plan the appliances on it within both the track’s own load limit and your flat’s 30-amp or 40-amp supply.
Click on the link to find out more about our services and products. Chat with our sales representatives today!